Project info
- Building
Construction of Waste Management Plant at Mambilla and Lungi Barracks
3GW6+9PG, Road, Maitama, Abuja 900103, Federal Capital Territory
15m x 5m
Blockwork, Reinforced concrete, Formwork, PVC piping, Water-proofing material, Digestion Fibre, Enzyme, Filter bed.
Organic wastes from households in Lungi and Mambilla Barracks, Abuja.
Project overview
The waste management plant is a bio-digester system. The primary aim is to solve the overflowing of human waste within the proposed NA Conference Center in Lungi and Mambilla barracks, Abuja, since Human Waste Management is an ever-growing problem leading to nuisance, the threat of organic pollution, and several diseases. It is the best alternative to a conventional waste treatment plant that is required to be powered by electricity due to the epileptic nature of electricity in the country. This technology offers a better level of treatment and operates on zero electricity cost, with loads of added benefits.
- Objectively innovate empowered
- Holisticly predominate extensible
- Procedures for reliable supply chains
- Dramatically engage top-line services
OBJECTIVES
To manage organic waste effectively and reduce environmental pollution. To produce biogas as an alternative energy source in the future. To generate organic fertilizer as a byproduct for agricultural use.
Benefits
- Cleared chambers by utilizing sewage pumps and sewage pressure trucks and increasing the diameter of the pipes.
- Rechanneling flooded water and the use of waterproofing materials to stabilize the tanks.
Road Project Next Project
















